90

Tripp Lite PDU 3-Phase 208V 8.6/12.6kW 48 C13 6 C19 20A Vertical Strip 0URM

Mfg. Part: PDU3V20D354B | CDW Part: 3938776 | UNSPSC: 39121017
$594.00SAVE $211.01
$382.99Advertised Price
Lease Option ($11.95 /month) Lease Availability
Close

Have leasing questions? Let us know how can we help.

Note: Leasing is available to businesses only. Leasing is not available to individuals.
800.800.4239
Mon-Fri 7am-7:30pm CT
Availability:5-7 days
Orders placed today will ship within 7 days
0
  • Power distribution strip ( rack-mountable )
  • 35 A
  • AC 200-240 V
  • 12.6 kW
  • 3-phase
  • output connectors: 54
  • 0U
View More
Product Overview
Main Features
  • Power distribution strip ( rack-mountable )
  • 35 A
  • AC 200-240 V
  • 12.6 kW
  • 3-phase
  • output connectors: 54
  • 0U
The PDU3V20D354B 8.6/12.6kW 3-Phase Vertical Power Distribution Unit(PDU) Outlet Strip is a required accessory option for Tripp Lite's PDU330AT6L21, PDU330AT6L15, PDU330AT6L2130, PDU330AT6L1530, PDU350AT6H50 and other 3-phase auto-transfer switch(ATS) PDUs that specify compatibility with this model. It's ideal for high-density equipment racks in data centers and server rooms. When used with 208V ATS models with a 35A input rating(such as PDU350AT6H50), the PDU3V20D354B supports up to 12.6kW total output with 20A maximum full balanced load per phase combination output bank (L1-L2, L2-L3, L3-L1). When used with 208V ATS PDU models with a 24A input rating (such as PDU330AT6L21, PDU330AT6L2130, PDU330AT6L1530 or PDU330AT6L15), it supports up to 8.6kW total output with 13.9A maximum balanced load per phase combination output bank. The 48 C13 and 6 C19 single-phase outlets receive power from the connected ATS PDU. The outlets are interlaced to help you balance loads by spreading connections across the phase combinations (L1-L2, L2-L3, L3-L1) throughout the rack. Each outlet is numbered and color-coded to help you keep track of connected devices and which phase combination powers each. The 2.5-foot power cord with 8-position plug connects directly to the PDU's rear receptacle. The PDU3V20D354B's rugged all-metal housing mounts in compatible racks in seconds with no tools needed. Vertical 0U installation reduces cord clutter and improves airflow through the rack.

Technical Specifications
Specifications are provided by the manufacturer. Refer to the manufacturer for an explanation of the print speed and other ratings.
Power Supply
Device Output Connector Type: Power IEC 60320 C13 , Power IEC 60320 C19

Cable
Connectivity Details Length: 2.5 ft
Connectivity Details Type: Power cable

Environmental Parameters
Humidity Range Operating: 5 - 95% (non-condensing)
Max Operating Temperature: 122 °F
Min Operating Temperature: 32 °F

Header
Brand: Tripp Lite
Compatibility: PC
Manufacturer: Tripp Lite
Model: PDU 3-Phase 208V 8.6/12.6kW 48xC13 6xC19 20A Vertical 0URM
Packaged Quantity: 1
Product Line: Tripp Lite

Miscellaneous
Color Category: Black
Compliant Standards: CSA , FCC Class A certified , NOM , RoHS , UL 60950-1
Height (Rack Units): 0

Power Device
Form Factor: Rack-mountable
Frequency Provided: 50/60 Hz
Input Wiring: 3-phase
Max Electric Current: 35 A
Output Connector Qty: 54
Power Provided: 12.6 kW
Voltage Provided: AC 208 V
Voltage Required: AC 200-240 V

Power Output Connectors Details
Connector Qty: 48
Connector Type: Power IEC 60320 C13
Voltage: 208



Connector Qty: 6
Connector Type: Power IEC 60320 C19

Service
Support Details Full Contract Period: 5 years
Support Details Type: Limited warranty

Dimensions & Weight
Depth: 2.2 in
Height: 70 in
Weight: 9.26 lbs
Width: 2.2 in

General
Product Type: Power distribution strip
Subcategory: Power distribution devices

Service & Support
Type: 5 years warranty

Cable Details
Form Factor: Integrated
Included Qty: 1

Dimensions & Weight (Shipping)
Shipping Depth: 5.9 in
Shipping Height: 76.6 in
Shipping Weight: 12.3 lbs
Shipping Width: 6.9 in

Miscellaneous (CDW)
Compatible With:
Tripp Lite Monitored Rack ATS

Product Reviews
 
Adding to Cart...
12/7/2016 4:45:26 PM
^ Back to Top

Maximum 300 characters
An account manager will email you within one business day to confirm your request.

Your Quote has been submitted

What Happens Next? A confirmation email is on its way. Within one business day, you will be contacted by an Account Manager to finalize your quote.

Error!

Something went wrong.

Please try again later.

License Selector

    The license selector is not currently available. Please try again later.